November 28th, 2008

Damn cold work on the roof job, can't seem to keep warm, working in water that is laying along the sides. We have removed the old flashing and sealed the perimeter of the "front" roof, what a miserable job. The roof mat was bent out and had set in that position due to the placement of the outer flashing, once that was removed we sealed the mat and glued it back to the wall. Concrete pads 12" X 12" were placed against the sealed mat to ensure a tight bond.

We will take Friday off and enjoy a "long" weekend.